Baltimore, MD
Completion Date: 1998
Duration: multiple projects 1978-1998
Contract Value: $20,000,000 total
Description:
Renovations were performed on numerous projects beginning in
1978 and most recently in 1997. The Lyric Opera House remained open
throughout the construction of each project.
The most recent project included the addition of office
space, loading dock and stair towers, plus general renovations.
An intricate part of this project was structural stabilization to
the existing building. The north and south sides of the existing
foundation were underpinned to facilitate installation of hand dug
caissons, which were required to support this addition as well as
future additions.